Tuesday 5 June 2012

A well-designed activity-based costing system starts with __________.

A well-designed activity-based costing system starts with __________.
A.   analyzing the activities performed to manufacture a product B.   assigning manufacturing overhead costs for each activity cost pool to products
C.   computing the activity-based overhead rate D.   identifying the activity-cost pools
 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.