Sunday 17 June 2012

Which of the following statements is true about value analysis/value engineering (VA/VE)?

Which of the following statements is true about value analysis/value engineering (VA/VE)?
a. The purpose of VA/VE is to simplify products and processes.
b. The objective of VA/VE is to achieve equivalent or better performance at a lower cost.
c. VA is performed before the production stage, while VE deals with products already in production.
d. both A and B
e. A, B, and C
 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.