Showing posts with label To tell if the standard deviation of a process has changed. Show all posts
Showing posts with label To tell if the standard deviation of a process has changed. Show all posts

Friday, 22 June 2012

To tell if the standard deviation of a process has changed, the control charts used are


 To tell if the standard deviation of a process has changed, the control charts used are
 A.  R and S charts. 
 B.  p and R charts. 
 C.  S and x bar charts. 
 D.   x bar and p charts